name | Motoyama Corporation Industrial Equipment Division |
location | 2-19-1 Kasugano, Hirakata City, Osaka Prefecture, 573-0131 |
Tel | 072-858-1098 |
Fax | 072-858-2766 |
Business manager | Mikifusa Kashiwagi |
Site area | 2121m² |
Start of operations | May 1991 |
Manufactured items | Electric furnaces, dryers, various glass testing machines, control devices |
access
○Keihan Railway | Get off at Hirakatashi Station, take any route bus from bus stop number 1, get off at Nishinomura bus stop and walk for 2 minutes |
○JR Gakkentoshi Line | Get off at Tsuda Station and walk 1km west for 15 minutes. Or take the bus bound for Hirakatashi Station and get off at Nishinomura. |
○Automobiles | From Osaka, turn right at Nonomiya intersection on National Route 1, approximately 2km. From Kyoto, turn left at Deyashiki Minami intersection on National Route 1, 1km. Turn left at Yotsutsuji intersection, 1km. |
Surrounding map
Test center
location | 2-3-35 Kasugano, Hirakata City, Osaka Prefecture, 573-0131 |
History |
September 2007: Started operation as the third factory of the Industrial Equipment Division. June 2009: Opened the Osaka East Sales Office in the adjacent office building. December 2014: Completely renovated the factory building and opened a test center and showroom. |
Site area | 1362m² (building 747m²) |
Second factory
location | 1-1-16 Kasugano, Hirakata City, Osaka Prefecture, 573-0131 |
History |
In 1969, the factory was established as a manufacturing plant for electric furnaces and other in-house products, and operations began. In 1991, the factory was renovated as the second factory following the completion of the new factory for the Industrial Equipment Division. In October 2000, the affiliated company Morita Corporation began using the factory to manufacture electric furnaces. In April 2014, the factory was absorbed by Morita Corporation and began operations as the second factory for the Industrial Equipment Division. |
Site area | 1085m² (building 500m²) |